Full Bespoke Joinery Package
Completed in Hammersmith in 2026, this project involved the delivery of a full bespoke joinery package within a highly restricted two-month programme. The works required detailed design coordination, precision manufacturing and careful sequencing to achieve a high-quality finish within a challenging timeframe.
Year
2026
Location
Hammersmith, London

Project Brief
The scope covered bespoke joinery to three bedrooms, together with full decorative panelling across three separate bathrooms. Each area required its own design approach, detailing and finish, resulting in a highly coordinated package with numerous interfaces between joinery, wall finishes, sanitaryware, lighting, ironmongery and surrounding architectural elements. The level of detail required throughout the project was significant. Dimensions, panel positions, shadow gaps, door alignments, junctions, reveals and internal layouts had to be coordinated to millimetre accuracy before manufacture. Detailed drawings and specifications were reviewed continuously to ensure every component could be manufactured correctly and installed without compromising the overall design intent. The finishing package was equally demanding. A wide range of spray-painted colours and finishes had to be managed across different rooms and individual joinery elements, requiring careful control of colour references, samples, preparation, spraying sequences and final matching. With multiple components progressing simultaneously, production and finishing had to be carefully programmed to avoid delays while maintaining consistency and quality throughout. The restricted programme added another level of complexity. Design development, final measurements, manufacturing, spray finishing and installation all had to progress within approximately two months, leaving very little tolerance for error or rework. Close coordination between the workshop and site teams was therefore essential, with each stage planned around the next to maintain momentum without compromising the quality of the finished product.
Our Solution
The project was delivered through detailed planning, precise technical coordination and continuous communication between our design, manufacturing, finishing and installation teams. By managing the complete joinery package in-house, we were able to maintain direct control over dimensions, production sequencing, quality and programme throughout the process. Despite the demanding timeframe and exceptionally detailed nature of the works, the package was completed to a high standard, with each element fitting seamlessly within the wider interior design. The finished result reflects the level of precision, craftsmanship and coordination invested throughout the project, delivering a refined and highly considered bespoke interior within an extremely challenging programme.